GROS-ITE OIL MIST LUBRICATED SPINDLE START UP PROCEDURES
Thank you for choosing Gros-Ite Spindle: Following are some simple steps you need to
follow prior to operating your Gros-Ite Spindle.
Handling:
A precision spindle must be handled carefully. The spindle should not be bumped or
dropped. Each spindle is securely packaged in a custom fitted shipping/storage case at the
factory. It is recommended that this case be retained for storage of the spindle when it
is not in use.
It is also recommended that the lubrication inlet ports and well as any drains or vents
that were plugged or covered during shipment remain plugged or covered until the spindle
is mounted to the machine or into a bracket. These features should remain covered or
plugged until the Oil Mist line(s) are ready to be connected to the spindle.
Storage:
If the spindle is idle, or will not be used for more than 30 days, it should be stored in
low humidity, and at normal room temperature (60-90 °F). To avoid contamination, all
inlets must be plugged and all drains or vents must be covered to prevent the ingress of
foreign particulate or liquids. Coat any unprotected metal surfaces with a metal
protectant to prevent rust or corrosion. (See Start Up)
The spindle shaft should be rotated during storage several revolutions by hand every 30
days. This will keep the bearings lubricated, as oil tends to settle in the bottom of the
raceways during periods of long-term storage. This action also prevents false brinelling
of the bearing races due to the inherent low-level vibrations present in most buildings.
Mounting Instructions:
As with any precision assembly, the mounting surfaces are critical to the spindle
performance. All mounting surfaces (spindle and machine) should be stoned and wiped clean.
This will eliminate any small nicks or burrs that may have occurred on the mounting
surfaces during shipping and handling.
Never deliver any shock loads or hammer a spindle. This will permanently damage the
spindle bearings and result in reduced life. Use pullers and jack screws whenever
possible. Mishandling the spindle will void the warranty.
For cartridge style spindles it is only necessary to tighten the clamping screws
sufficiently enough to prevent the rotation of the spindle housing in the bracket. Over
tightening of the clamping screws may destroy the built-in clearances to provide ideal
performance of the spindle bearings. This can cause overloading and overheating of the
bearings and result in chatter and vibration as well as shortening the life of the
spindle.
If the spindle is belt driven: The proper tensioning of the drive belt is essential to the
performance and life of the spindle. The belt should be tensioned enough to prevent
slippage and vibration, but loose enough to prevent excessive radial load being
transmitted to the rear bearings.
Motorized Spindles:
If your spindle is motorized and requires liquid cooling use PH balanced water based
coolant with a rust inhibitor. A good coolant is a 50-50 mix of water and antifreeze.
Water with high salt or mineral content should be avoided, as it tends to leave deposits
in the internal porting, which can become plugged. The coolant flow rate recommended is 6
gallons per horsepower per hour at a temperature of 70-80 °F. If oil is used as the
cooling media, the flow must be increased to 15 gallons per horsepower per hour. The
coolant pressure at the spindle should not exceed 35 psi.
Oil Mist Lubrication System
The majority of Gros-Ite designed (and most other competitor's) spindles using Oil-Mist
Lubrication were designed to use a Norgren Oil Mist Lubrication System consisting of the
following:
#B12-221-A2LA Filter/Regulator
#10-015-004 Lubricator
#18-001-015 Mounting Bracket
#18-014-001-013 Solenoid Valve
Please contact Gros-Ite Spindle if this spindle will be operated with a lubrication system
other than a Norgren Oil-Mist System.
It is highly recommended that an air pressure switch be installed on the output side of
the lubricator to ensure that there is oil mist pressure to the spindle. The signal from
the pressure switch should be interlocked with the Start/Stop circuit for the spindle
drive motor, preventing the starting of the drive motor unless oil-mist pressure is
present. It is also highly recommended that an oil level switch be installed in the oil
mist reservoir. This switch can be interlocked in the same manner as the pressure switch.
The Oil-Mist Lubrication System should be installed at a point higher than the spindle
being lubricated and not more than 15 feet from the spindle. The connecting oil mist
line(s) should be arranged to eliminate any loops or sharp bends that could create oil
puddles or restrict oil flow.
Use plastic tubing with a minimum inside diameter of 3/8" from the lubricator to the
spindle. All fittings and connecting tubing are to be deburred and flushed with clean,
filtered solvent or oil and blown out with clean dry air prior to connecting to the
lubricator and the spindle. This greatly reduces the chance of contamination entering the
spindle.
DO NOT use Teflon tape on any of the connections between the lubricator and the spindle.
Teflon tape may break or flake off and travel into the oil mist orifices in the spindle
causing a blockage. It is recommended that Loctite Hydraulic Sealant #569 be used. Use
only brass, stainless steel, or un-plated steel fittings on the connections between the
spindle and the lubricator. Plated fittings should not be used as the plating can shear
off and either block a mist orifice or damage the bearings.
It is highly recommended that the oil mist be started, either manually or automatically,
approximately 10 minutes prior to the start of the spindle. This allows sufficient wetting
of the balls and raceways. Spent oil should be present at all of the vents and around the
end caps. Additionally, it is highly recommended that the oil mist be allowed to operate
for a period of 10-15 minutes after the spindle is shut down. This serves to act as a
purging action to prevent the ingress of contaminants as the spindle cools down.
The air supply to the Oil-Mist Lubricator should be clean and dry. The use of a
combination filter/dryer prior to the Oil-Mist Lubrication unit is highly recommended. A
coalescent type dryer is preferred to the desiccant type dryer. Gros-Ite recommends the
use of a P/N 79895115 filter/dryer with a .01-micron filtration rating available from MSC
Industrial Supply.
The oil used in the oil mist lubricator should be highly refined mineral based oil.
Depending on the type and style of the spindle, the oil will have a viscosity of 54-66 SUS
@ 100 °F or 150-165 SUS @ 100 °F. The specific type of oil used to lubricate the
spindle is specified in the instruction manual included with the spindle.
A listing of approved oils is included in this on line manual.
Setting the Lubricator The Norgren Lubricator has several adjustments that need to be made
prior to operating the spindle. They are:
-
Air Pressure at the regulator.
-
Air Pressure at the spindle.
-
Oil Drops per minute
Included in this manual is a listing of the proper settings for your new Gros-Ite Spindle.
A temporary pressure gage should be installed in a tee at the spindle oil mist inlet to
ensure proper setting of the pressure at the spindle.
With the temporary gage in place and the oil mist line connected to both the lubricator
and the spindle, adjust the pressure regulator to the setting supplied. This pressure is
read on the gage mounted to the regulator body.
Adjust the air bypass screw on the lubricator to the setting supplied. This pressure is
read on the temporary gage installed at the spindle Oil-Mist inlet.
Once the pressures are set, adjust the drops per minute to the specified value.
Remove the temporary gage from the Oil-Mist line and connect this line directly to the
spindle.
When the above adjustments and gage removal have been complete, allow the lubricator to
run for 10-15 minutes and observe the vents and end caps on the spindle. There should be
air and oil present at these points.
Once the presence of air and oil have been verified, begin running the spindle. The
temperature of the spindle should be monitored closely for the first hour of operation as
a safety precaution.
Oil Mist Data
Type of Lubricator: SEE DATA IN MANUAL SUPPLIED WITH SPINDLE
Type of Oil: SEE DATA IN MANUAL SUPPLIED WITH SPINDLE
Air Pressure at Regulator: SEE DATA IN MANUAL SUPPLIED WITH SPINDLE
Air Pressure at spindle: SEE DATA IN MANUAL SUPPLIED WITH SPINDLE
Oil Drops per Minute: SEE DATA IN MANUAL SUPPLIED WITH SPINDLE
Spindle Test Data including test speed and stabilized operating temperatures are included
in this manual on the Gros-Ite Final Inspection Form included in the installation manual
supplied with the specific spindle.
Start Up:
Although your Gros-Ite Spindle has been thoroughly tested to the full operating speed at
the factory, we suggest that when you receive it, or after it has been sitting idle or in
storage for thirty (30) days or more, the spindle should be run up gradually prior to full
time operation.
We also suggest the following:
-
First rotate the spindle by hand to insure that it spins unobstructed or without any
noticeable noise.
-
Then begin running the spindle at 10% of the max operating speed for a period of 15
minutes.
-
If the temperature does not exceed 100 °F or if you have no temperature sensor,
hot to the touch. Increase the spindle speed an additional 25% and run for 15 minutes.
-
Continue this process increasing the speed each time by 20% until the full operating
speed is reached. If at any time during the run up the spindle exceeds 120 °F the
spindle should shut down and be allowed to cool to ambient temperature before
restarting at the previous speed. If after a run of 15-30 minutes the spindle does not
stabilize or show signs of stabilization contact Gros-Ite Spindle for further
information.
-
Once stabilized at the full operating speed the spindle should run no hotter than
120 °F. After this initial start up is completed the spindle may be now run at the
full operating speed immediately upon start-up. However, please note that if the
spindle has been in storage for thirty (30) days or more, this process should be
repeated.
If the machine the spindle is mounted to has an automatic speed ramp up, it is recommended
to give the spindle a 15-30 second ramp up to full operating speed after the initial start
up procedure has been completed.
Tool Installation:
Avoid installing a cold tool in a warm spindle. This is of particular importance with the
shallow tapers in an internal grinding spindle. By installing a cold quill in a warm
spindle, the quill will be positioned too deep in the spindle shaft taper due to thermal
expansion from the heat. When the spindle assembly is subsequently cooled down you will
create a shrink fit of the quill in the taper, and most probably, the quill cannot be
removed without machining and doing potential damage to the bearings.
If at anytime you should have any questions please give us a call @ 800-851-2654. Again,
thanks for choosing Gros-Ite, we appreciate your business.
|